This afternoon a CDS multimode fibre optics cable was pinched against the cable tray near BSC8, causing the fast DAQ data from the LVEA to be stopped. For the rest of this week the aligo DAQ will record EY channels and slow channels from the LVEA. On monday the H2 racks will move into the H2 EE building and the missing DAQ channels will be restored.