Observation Bit: Commissioning
16:00 Day shift IFO to LCS_FF
16:08 Lockloss – Guardian recovering
17:35 IFO Locked at LCS_FF
17:38 Lockloss – Guardian recovering – Will take the IFO to LSC_FF at lower power (16.6w)
18:24 Set Observation bit to Undisturbed
00:00 Some glitches but Lock held at 48Mpc