Times in UTC
7:00 Came in to find the IFO had been locked to LSC FF for several hours already, left it as is
9:57 Seeing that Livingston had dropped lock, switched Intent Bit to commissioning, and with a suggestion/assistance from Dan H., undamped the bounce mode of ITMX for a ringdown measurement of its Q. Gain of H1SUS-ITMX_M0_DARM_DAMP_V set to 0.0 (from 0.3) for ringdown. Will need to set back to actively damp the mode once Dan is satisfied
10:58 Switched Intent Bit back to undisturbed
14:11 Switched Intent Bit to commissioning. Edited LSC_FF guardian to bring laser power back to 24W. Switched Intent Bit back to undisturbed.
14:35 Lockloss (Richard volunteered to take blame)
14:39 Reduced power back to 16W. Initial alignment.
15:00 Handoff to Patrick.