10:03 Betsy, Kyle, Nutsinee into LVEA (Nutsinee to take pictures with cell phone of ITMX and ITMY spools, Betsy to retrieve equipment, Kyle to check on equipment) 10:13 Kyle out 10:14 Nutsinee out 10:15 Betsy out 14:22 Joe moving cabinets from OSB to staging building ~15:25 - 15:53 Greg moving cabinets from computer users room to staging building I ran an initial alignment in the morning and made it to LSC_FF but the range was unstable and didn't last long. Had difficulty locking and staying locked the remainder of the shift. Evan and Sheila are continuing to track down the cause.