The ITMY/FMY cartridge was successfully flown today from test stand #2 in the LVEA and deposited into BSC8. The ITMY SUS fibers were confirmed afterward to be intact. We found the payload (including ISI, the 2 SUSs and limited rigging) to be 9260 lbs, well under the crane limit. We will log more details, including photos, in coming entries.