LHO General
thomas.shaffer@LIGO.ORG - posted 19:31, Friday 05 June 2015 (18920)
Ops Report

With LLO down, we have some work permits to take care of.

The work consists of: Stefan increasing the power back to 23W and Kiwamu enabling a low-pass filter in SUS SR2.

At 19:28pst the Intention Bit was switched to Comissioning to reflect the work being done.