Times are local
20:00 John W called and said LVEA temps were running away, we agreed that LLO being down meant it was probably ok to risk turning off a heater
21:00 PI rings up, I turn power down at ~21:15, which messes with calibration
21:30 Lock loss, Guardian starts trying to lock, fixes change I made to laser power and thus fixes calibration
23:00 I start working on re-aligning after multiple RF DARM locklosses