Today: LLO is recovering from a power outage Hugh looking at cause of BS trip over weekend Kingsoft will be on site to replace RO filters John may change chilled water setpoint if IFO loses lock There will be a vent planning meeting at noon Tuesday: Betsy to run charging measurement Jim B. to perform filesystem maintenance on framewriters Richard to look at cosmic ray detector Kyle to work on TMDS piping and run pumps at end X Jeff B. to set up dust monitors at end stations