Times UTC
11:00 Leo and Betsy still taking charge measurements
11:03 Robert back from Y arm beam tube enclosure
1:32 Leo done with charge measurements
1:42 returned ETMx and ETMy ESD to nominal states
2:00 started initial alignment
Winds have been mid-20 to low-30 MPH since the start of the shift. Locking attempts have been unsuccessful, stalling at DRMI 1f so far. I talked to Gary in the CR at LLO a couple of times now to give him a heads up that we are in for a tough evening.