Displaying report 1-1 of 1.
Reports until 00:04, Friday 12 June 2015
H1 General
travis.sadecki@LIGO.ORG - posted 00:04, Friday 12 June 2015 (19087)
EVE shift summary

Sheila added a "Brief Version" of the initial alignment procedure to the OPS wiki page.  It is a the top of the IA wiki, above the more verbose version used by the operators up to now.  The idea is that as we become more familiar with locking the IFO, we'll need more of an outline of what to do than a step by step procedure with all the possiblilites spelled out.  She is hoping this will speed up the lock acquisition time and increase the duty cycle.

Struggled with wind all night.  Never got past DRMI 1f.  I did initial alignment several times (for practice and to make sure I wasn't missing something).  Good luck TJ.

Images attached to this report
Displaying report 1-1 of 1.