thomas.shaffer@LIGO.ORG - posted 08:09, Sunday 14 June 2015 (19133)
Ops Report
End of Engineering Run 7.
All was quite for my shift after the measurements. The range shows many glitches, but a nice, long lock. Keeping the Intent Bit on Undisturbed until Im told otherwise.