Reports until 17:33, Wednesday 14 December 2011
H2 SEI
hugh.radkins@LIGO.ORG - posted 17:33, Wednesday 14 December 2011 (1916)
Eight More Feedthrus added to BSC8 Chamber
We got the more improved version of the 4.5" Dual Triax Feedthru from C&B this afternoon and promptly installed them on BSC8.  We added six of these and also two more of the 3Pin Power Feedthrus for the EM Actuators.  So aside from the single ESD Feedthru still being improved at the vendor, that is all of the Feedthrus for BSC8.

These are installed but not torqued up--I'll get Apollo to do that Thursday.  Once that is complete, the Cable trays can be replaced, cables run and then we can start powering up the ISI.  Also then the HEPI Dial Indicators can be installed for IAS moves.

Thanks to Mitchell, Calib and Devil-Dog Ed.