Kyle, Gerardo Vented X-end (DP < -45 C)-> Vented Y-end (DP < -35 C) -> Installed NEG assembly on BSC6 -> Installed TMDS reducing nipple+valve+elbow on BSC10 Kyle, Gerardo, Bubba Removed BSC9 West door at X-end -> Removed BSC10 North door at Y-end Bubba Connected TMDS 100 psi line to purge-air skid