Displaying report 1-1 of 1.
Reports until 09:52, Tuesday 16 June 2015
H1 SYS
daniel.sigg@LIGO.ORG - posted 09:52, Tuesday 16 June 2015 - last comment - 07:56, Tuesday 14 July 2015(19166)
Commissionoing Tasks

List of commissioning tasks

The list below is for the time between now and O1. Since the sensitivity has reached the nominal goal set for O1, we plan to prioritize reliability and operations issues to maximize the up-time.

Reliability and Operations

  1. MICH freeze/feed forward
  2. Move to 90mHz blends everywhere
    Beam splitter and in transverse direction on test masses.
  3. Better automation of bounce/roll damping based on monitors
  4. Investigate alignment drift of SR3 (heating)
  5. Alignment stability at high power
  6. Thermal tuning of ITMs (stability, check contrast defect, sensitivity, ASC matrix)
  7. Make a permanent PI monitors (down-convert 15kHz and record)
  8. Optimize PI mitigation
  9. Duty cycle improvements in locking procedure
  10. Damp violin mode harmonics (needs more filters in SUS model)

Sensitivity

  1. Monitor discharging, charge noise and ring heater coupling
  2. Angle to length decoupling; try to make it permanent.
  3. Intensity noise coupling and mitigation
    Are the IMC ASC offsets stable without auto-centering?
    Minimize acoustic noise coupling (new PSL periscope mount ready?)
  4. Move to in-vac refl sensor (or figure out why we can't)
  5. Frequency noise investigation; why is it so high?
  6. Oscillator noise couplings
  7. New OCXO and EOM drivers
  8. Re-engage low pass on ETMY ESD
  9. Investigate/find low frequency noise
  10. Investigate beam tube dust glitches (histogram, distribution, quiescent rate)
  11. HAM6 scattering measurements after the shroud installation and beam diverter move
  12. SRC/PRC alignment effect on sensitivity
  13. Check noise on all coil outputs(?)
  14. Check/explain shot noise number (null stream)
  15. Find best beam spots on ETM/ITMs (maybe wait for ER8)

Others

  1. Finish SRC length/Gouy phase measurements
  2. Final OMC alignment scheme
  3. OMC alignment scheme that doesn't rely on the OMC SUS
  4. HWS to investigate thermal loading
  5. Timing studies
Comments related to this report
corey.gray@LIGO.ORG - 07:56, Tuesday 14 July 2015 (19615)

Under Reliability & Operations, I would also add:

11)  Help to Train Operators

Displaying report 1-1 of 1.