ISC EX/EY TMS work done, new QPDs need tested
ETMX pitch offset de-biased, charge measurments/mitigation need to be done
Lots of model changes being done, trying make models the same between LLO/LHO
Vacuum ports at EX, venting HAM6, EY maybe closing today
Water leak possibly fixed at VPW
Safety: JohnW reminds everyone of LIGO stop work policy. You have the right to speak up / stop any activity if something looks amiss.
Be mindful of the heat
Fire hazard is high, no vehicles allowed offroad
Lots of new people on site, SURFS and others...