Calum & Kate
Finished unwrapping and inspecting all 26 panels of black glass. 100% of the parts made it in one piece and all of the coatings look good. This is great news! The panels are dusty, smudgy, and streaky; and will need to be cleaned (this was expected). The plan is to use a methanol rinse followed by drag wipping. 24/26 pieces of glass were rinsed 2x, so we're about halfway through the cleaning effort. Currently using 3 large cleanroom tables, but we'll need at least one more for prep work.
Two points of note for LLO:
1) The following parts were packaged between 2 sheets of float glass:
D1500054-101 & 102
D1500055-101 & 102
It was a good idea to protect the oddly shaped parts, but care should be taken when opening them because a couple pieces of the float (packaging) glass had chips and cracks and these were spread around the wrapping. Again these did their job and protected the black glass (which was in good shape) just a heads up.
2) Some of the parts are double packed in the bubble wrap. Again caution when opening.