Posted below are the dust trends for the past week, during the vets of End-X and End-Y. Plots are as expected. There are large numbers of high counts in the VEAs (monitor VEA1), which are consistent with work activities in the VEAs. The counts within the cleanrooms over the chambers show decent isolation of these spaces from the clouds of particles found in the VEA in general. The large spikes within the cleanrooms (monitor VEA2)seen on 6/17 at End-Y and on 6/18 at End-X are the doors being installed. The flat line from VEA2 at End-Y starting on the 18th is the dust monitor being powered down.