corey.gray@LIGO.ORG - posted 15:49, Friday 16 December 2011 (1929)
HAM1 SEI Stack & MMT3 Removed From HAM1

(Corey, Mark, Randy, Zach)

With yesterday being devoted to clearing out an already-congested LVEA South Bay (& releasing load on Scissors Table Spring Cups), we started bright and early today on extracting iLIGO hardware from HAM1 [this was all done with only the West door off].

The MMT3 was slid out via the teflon highway, and we slid it onto a mini-surfboard mounted on the forklift.  (This SUS Assembly is now in the Optics Lab)

After this, we removed everything above the Support Table for this Seismic Isolation Stack (i.e. Optics Table, Masses, Springs, etc.).  Minus the Springs, we were asked to wrap & bag all the hardware (this generally doubles the time of the work).  The Optics Tables and Masses are currently wrapped and bagged and in the area near the racks. 