Items from meeting
-
SEI: Output arm work (Jim), end station hepi change due to power supply change
-
SUS: No report
-
HAM6: Some black glass installed yesterday, had to remove black glass beam dump, will continue installing rest of glass today, & Matt will talk to Keita about Beam Diverter. Hope to be done mainly today
-
18bit daqs replaced for OMC/SUS--hope to do this today (EE group)
-
Post OMC plan for HAM6: Re-establish operational state for SEI, or work on alignment next (Will have meeting this morning to go over this.)
-
Filiberto: ESD interlock cables run at end stations
-
TCS group: check alignment of y-arm CO2 laser--->Probably tomorrow when we go to laser hazard.
-
VAC: end stations still pumping
-
Facilitiy: routine
-
Beam tube conduit install (xarm done, yarm started) by Ken
-
Leonid & a SUS person are set to do EX/EY charge measurements
-
Went over Work Permits
Laser Safety: For any laser safety issues or Work Permit sign-offs please see John Worden (Peter King out till 7/13)
Morning Safety Meeting (Worden)
-
New Fault Report System (FRS) discussion by Richard Oram at 3pm
-
Drive slow along arms due to work!
-
Watch for animals heading for river due to heat
-
SURF students General Safety reports need to be left in John's mailbox.