H1 AOS
cheryl.vorvick@LIGO.ORG - posted 18:20, Friday 16 December 2011 (1932)
TCS Ring Heater in BSC6 passes the in-vacuum cable continuity check.
The RH installed on the quad for BSC6 had an encounter with the fiber pulling laser, and has a couple burn spots.  I checked the resistance of the RH cabling at connector J9 today, and all wires check out OK, except the RTDs which we knew were broken.

Table of resistances is attached.
Non-image files attached to this report