Bubba Gerardo We moved 3 clean rooms, several tables, and miscellaneous items left in clean rooms and on tables from HAM 6 area to a location in front of the Hi-Bay. We now have access for the east door to be installed and with a few strategic crane/fork lift moves, the south door will be ready to install. The garbing room remains powered up and in the same position as this week until the south door is ready for install, therefore travel on the south side of H-1 output is still restricted.