LVEA: Laser Hazard Observation Bit: Commissioning 07:30 Karen – Restocking garb at end stations 07:30 Jodi – In LVEA for 3IFO and property management work 07:55 Sprauge on site to check traps – Joe D will escort 08:00 S&K Electronics – Installing conduit in X-Arm near end station 08:20 Jodi – Out of the LVEA 08:22 Patrick – Setting up test equipment for Beckhoff vacuum testing 08:25 Gerardo – Vacuum survey in LVEA 08:32 Bubba – Going to Mid-X looking at the grout 08:35 Richard – Going into LVEA for Beckhoff vacuum testing 08:39 Karen – Back from the end stations 08:40 Christina & Karen – Going into the LVEA 08:41 Gerardo – Out of the LVEA 09:02 Katie – In the LVEA checking Magnetometers 09:05 Kyle – Going to End-X 09:22 Jim – Working on HAM3 09:26 Bubba – Back from Mid-X 09:27 Bubba – Going into fan room in the mechanical building 09:45 Jeff K. – Going into the CER 10:15 Richard & Patrick – Out of LVEA finished with test 10:23 Jordan – In LVEA installing PEM antennas 10:56 Dave & Jim – Installing 18 bit DAC cards at HAM5 & HAM6 11:00 Rick & Jason – Going into PSL enclosure to look for replacement optics 11:13 Filiberto – In CER to swap EtherCAT chassis 11:15 Richard – Power cycling MC2 (and other suspensions) chassis 11:26 Richard – Out of the LVEA 11:28 Kyle & Gerardo – Going to HAM6 to setup and start pumping 11:30 Jim – Going into LVEA to swap bad 18 bit DAC card 11:32 Rick & Jason – Out of PSL Enclosure 11:49 Filiberto – Out of the LVEA 12:04 Kyle & Gerardo – Going to End-X to recover leak checker 12:43 Kyle & Gerardo – Back from end station – Going to HAM6 12:48 Kiwamu – Restart LSC frontend model 13:18 Kyle & Gerardo – Out of LVEA – HAM6 is being pumped down 13:45 Sheila – Transition LVEA to laser hazard 14:06 Kyle – Going to HAM6 14:08 Jordan – Out of the LVEA 14:36 Greg & Nutsinee – Going into the LVEA to start TCS chillers and check tables 14:46 Patrick – Pause replication & backup on H1conlog1-replica 15:45 Greg & Nutsinee – Out of the LVEA 15:55 Dave – DAQ restart 15:59 Kyle & Gerardo – Going to HAM6