All times in UTC.
15:00 Morning Checklist:
15:45 Leo doing Charge measurements
15:57 Kyle out to HAM6 to disconnect uneccesary equipment.
16:26 Sudarshan out to LVEA to set up ISS second loop measurement. (called back due to Jim taking measurements on IMCs
16:33 Fil to EX to take meauerements for P-Cal cables.
16:50 ITMY RMS watchdog tripped. Reset.
16:53 Kyle back from HAM6
17:00 - 18:00 Luca's training class
18:15 Sudarsh and Kiwamu out to LVEA to set up ISS Second loop measurements
19:24 Leo finished doing charge measurements.
20:00-21:00 Luca's training class
20:36 Bubba and John to both end station mechanical rooms
21:21 Jordan and Katie to EX. PEM Install and Calibration.
22:30 Sudarsh and Kiwamu into LVEA.