Reports until 21:39, Tuesday 20 December 2011
H1 SUS
corey.gray@LIGO.ORG - posted 21:39, Tuesday 20 December 2011 (1945)
HAM3 Work Today: Doors Removed, and Table Cleared

(Corey, Ed, Mark, Slim Jim)

Today we removed components from the HAM3 Optical Table (Recycling Mirror, Telescope, Beam Dumps, and weights).  We also did preparations for iLIGO stack removal tomorrow. 

The Telescope was removed and not kept clean (it is on the floor in the south bay).  There is no distiguishing serial number on this assembly other than part numbers for individual parts. 

The Recycling Mirror (RM) was kept semi-clean, and is on a table in the Optics Lab with several other iLIGO Suspensions.  This mirror is designated as:  RM03-B.

The forklift with a short "surfboard" was used to pull the Telescope and RM from the HAM3.  This work took roughly 4hrs.

Photos of HAM3 work from today and tomorrow will be posted in Resource Space at this location:

https://ligoimages.mit.edu/?c=897

Images attached to this report