The dewar level for CP7 is relatively low and the LLCV % open is nearly maxed out -> The vapor head pressure is 20 < pressure < 25 psi which should be more than adequate -> Delivery isn't for 6 more days -> At this rate we will have to do something or CP7 will have to be filled manually