Chris S. Joe D. 7/8/15 Installed aluminum strips on 39 joints beginning 604 meters from the corner station and continuing north and caulked 13 of those. 7/9/15 Finished caulking the joints from yesterday and cleaned 10 additional joints ending 756 meters north of the corner station.