In anticipation of putting the Arm Cavity Baffle on to the ISI Stage0, we've put the HEPI (and entire Cartridge) on stops at the HEPI Crossbeam Foot. This lifted the assembly 1 to 2 mils (.001-.002") monitoring the dial indicators. We also brought in the out board stops (facing inward) on each Foot just to further constrain the position. In case I don't make it back after the new year please don't forget. GregG knows the story and where the numbers are recorded. *** Please don't disturb the dial indicators at the Support Tube ends *** Once the ACB is mounted up, we'll lift the load off the set screws, back them out of the way and set the payload back where it started.
Correction: FMy was left off it's stops over the break as well. All suspensions in BSC8 are currently hanging and awaiting TFs in preparation for the handoff to SEI for their portion of testing.