Tuesday Ops Log

Happy New Year: Glad to be back.

- SUS continuing transfer function measurements on H2 ITMY
- IAS at BSC8 aligning baffles
- H1 PSL flooring crew arrives
- Removing iLIGO piers and cross-beams from HAM2
- Setting MC tubes at H2 output
- UniFirst, Praxair deliveries
- FilibertoC by HAM2, pulling cable

The Control Room is no longer in use as it is being upgraded:

- The daily morning INS meeting is now held in the large OSB Conference Room. Extension 203 will no longer lead you to the INS Meeting.

- The new ops station is across from the Control Room, in the Computer Users Room. There is a roof-cam for deliveries, EPICS alarm handler, MEDM, phones (x202/Gate and x158), an Mac workstation with two monitors and a miniMac with a huge HDTV (will have PIP with roof-cam once we figure that out). If you run Safari on the miniMac (HDTV), you'll see links to see the cameras in the outbuildings. There's still significant fan noise from the Beckhoff SuperMicro rack-mountable test machine and the LDAS tape library. Nevertheless, we are working on damping these noise sources. Eventually, the LDAS tape library will be shut down.

- There is a large CDS antique collection outside of the Control Room for enhancing your productivity at work (not home). Unclaimed items will be discarded.