(Corey, Hugo, Jim, Mitch)
Assy #3
-
Removed Large Masses (iLIGO Leg Elements)
-
Installed Lifting Brackets for when we are ready to pull out this assembly.
For all intents and purposes, this Assembly is ready to be pulled off the Test Stand.
Assy #1
-
Connected Actuators to Stage-0
-
Reamed out holes for CPS Target Mounts & then mounted/aligned Vertical CPS (Capacitive Position Sensors). Once again, the locations of all of the CPS's for this Assy is in this elog.
-
Run dirty cables from Assy#3 to Assy#1
-
Ran quick check spectra on GS-13s (to ensure they are operational post-move from Assy#3)
-
Outer Walls installed
-
In-Vac cabling run