H2 CDS
david.barker@LIGO.ORG - posted 20:24, Thursday 05 January 2012 (1985)
control room and msr upgrade, timing glitch

Upgrade of control room and MSR update. Floor tiles were removed, under floor cables are being removed. Timing system in the MSR was glitched, requiring all front ends plus their IO Chassis to be power cycled. All systems were burt restored to 15:00 local time.