Richard M. Vinny Roma, This morning we pulled our wagon of toys out to the vault to installed the STS-2 seismometer and return the Magnetometer coils to the vault. After getting lost in the desert we were able to locate the Vault. The seismometer was installed and cabled. We know there are signal problems but that can be addressed later. Getting all the material out to the vault before it got too hot was the goal for today. After Gerardo powered up the battery charge we had power to the fiboxes and Vault so signals to the mid station. I was able to confirm the cabling for y and z channels but not x as it is railed at the mid station. I will continue to work on this system to get all of the signals working. Probably will need another excursion to the vault to push the centering servo button. Thank to Vinny for all his help. I would still be out in the desert had he not helped.