tyler.guidry@LIGO.ORG - posted 13:37, Friday 26 December 2025 (88660)
12/26 Site Walkthrough
Utilizing the buddy system, (R. McCarthy) I walked the site today and found no immediate issues. The first half of x2 is a barely passable but am working with VAC to determine the next delivery location. To that end, all CP access points are largely unobstructed. The wind fence shows no additional damage at EY, and EX is still intact. FAC systems are operating normally. Large heat load spaces felt cool, no doors were found ajar and the water system is behaving normally (presently full @ ~66.5"). VEA's were all business as usual. 

During the visit I noted a magmeter flow value of 1010675 which should serve as a useful metric in determining any leak/bleeding of the potable system. While at the water room, domestic supply pressure appeared to be holding well. A follow up on the morning of 1/5 will be performed to understand usage over the break while little to no demand is applied.

T. Guidry
LHO General
ryan.short@LIGO.ORG - posted 15:03, Tuesday 23 December 2025 - last comment - 16:57, Tuesday 23 December 2025(88653)
Ops Last Day Shift of 2025 Summary

TITLE: 12/23 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: A fittingly quiet day today. HAM7 alignment work wrapped up this morning, so I transitioned the LVEA to Upgrade Phase Laser SAFE for the break. The stair move from EY has been postponed to the new year due to high tumbleweed interference. Control room workstations (with the exception of operator and VAC stations) and wall FOMs (with the exception of CDS, VAC, and temperature monitors) have all been shut down.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:57 SAF LASER SAFE LVEA NO LVEA is Upgrade Phase Laser SAFE Ongoing
16:17 FAC Kim, Nellie LVEA - Technical cleaning 16:53
17:19 SQZ Sheila, Kar Meng LVEA YES HAM7 beam alignment 19:57
18:37 SAF Travis EX N Updating laser signs 19:00
19:57 SAF RyanS LVEA YES Transition to Laser SAFE 20:13
21:07 VAC Travis LVEA N VAC walkthrough 21:44
22:07 TCS RyanS MER N Checking TCS chillers 22:20
Comments related to this report
david.barker@LIGO.ORG - 16:57, Tuesday 23 December 2025 (88654)

EDC had lost connection to 156 nuc cds_load_mon channels after the shutdown. I am running a temporary IOC to serve these channels and "green up" the EDC.

nuc_dummy_ioc.py is being ran as david.barker in a tmux session called nuc_dummy_ioc on opslogin0.

LHO General
ryan.short@LIGO.ORG - posted 07:55, Tuesday 23 December 2025 (88648)
Ops Day Shift Start

TITLE: 12/23 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 6mph Gusts, 4mph 3min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.21 μm/s 
QUICK SUMMARY: For the last shift of 2025, there's not too much slated for today; see below.

LHO General
ryan.short@LIGO.ORG - posted 17:01, Monday 22 December 2025 (88642)
Ops Day Shift Summary

TITLE: 12/23 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Light day of work today. SQZ beam alignment continued in HAM7 (alog88641), the EY wind fence was patched up (alog88640), more clamps were placed on HAM1 door covers for the break, and fire pumps were churned. HAM7 alignment will continue and hopefully conclude tomorrow, then the LVEA will be transitioned to Laser SAFE.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:57 SAF LASER LVEA YES LVEA is LASER HAZARD (\u2310\u25a0_\u25a0) 10:51
16:08 FAC Kim, Nellie LVEA - Technical cleaning 17:59
16:54 FAC Eric Site N Running fire pumps 17:35
17:36 SEI Jim, Randy, Mitchell EY N Wind fence work 20:04
17:54 CDS Erik FCES N Fix Wifi 18:10
19:46 FAC Kim EX N Technical cleaning 20:23
20:47 SQZ Sheila LVEA YES HAM7 SQZ beam alignment 23:57
20:47 CDS Dave MER, EY, MY N Setting up signage 21:32
21:13 AOS RyanC LVEA - Adding clamps to HAM doors 21:48
21:42 SQZ Kar Meng LVEA YES HAM7 SQZ beam alignment 23:57
22:46 AOS Richard LVEA - Checking in at HAM7 23:00
00:05 JAC Jennie LVEA, Prep Lab - Parts checks 00:30
00:52 OPS TJ LVEA - Checks and walkthrough 01:00
LHO General
ryan.short@LIGO.ORG - posted 07:46, Monday 22 December 2025 (88634)
Ops Day Shift Start

TITLE: 12/22 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 6mph Gusts, 4mph 3min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.23 μm/s 
QUICK SUMMARY: Cold and foggy morning on-site. Lighter days of work planned for the next couple of days, but at this point here's the outlook:

LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:36, Thursday 18 December 2025 - last comment - 16:38, Thursday 18 December 2025(88603)
OPS Day Shift Summary

TITLE: 12/19 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

IFO is in IDLE for PLANNED ENGINEERING

Summary of activities today:

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:57 SAF LASER LVEA YES LVEA is LASER HAZARD \u0d26\u0d4d\u0d26\u0d3f (\u2022O\u2022) 10:51
15:46 FAC Tyler and Crane Tech LVEA Y Crane upgrades south Bay 18:33
15:59 FAC Kim, Nellie LVEA Y Technical cleaning 16:46
16:09 FAC TJ LVEA Y Dust Monitor 10 Check 16:46
17:22 JAC Masayuki Optics Lab N JAC Work 19:18
17:35 FAC Kim MX N Technical Cleaning 18:32
17:40 SQZ Sheila, Robert LVEA Y Hunting for scattered light 19:35
17:46 PEM Jim, Randy LVEA Y PEM Support Tube Plate Check 18:15
17:51 SQZ Eric, Daniel LVEA Y Scattered light checks 19:35
17:57 TCS Matt Vac Prep Lab N Cheeta 19:09
18:17 SQZ Jennie LVEA Y HAM7 work 18:30
18:29 ISC Betsy Optics lab N Checks 19:18
20:44 ISC Betsy LVEA HAM1 Y Open light pipe, HAM1 work 22:37
20:56 FAC Crane contractor LVEA Y Crane inspections 00:55
21:08 SQZ Daniel, Eric, Kar Meng LVEA Y HAM 7 OPO 00:03
21:09 PCAL Tony PCAL N Transfer Meas. 22:30
21:09   Keita LVEA Y Checking in with Betsy 21:37
21:15 FAC Randy LVEA Y Checking on crane man 21:42
21:17 IAS Jason LVEA Y FARO Work BSC2 23:17
21:20 IAS' Ryan C LVEA Y FARO BSC2 23:20
21:29 TCS Matt Vac-Prep Lab N Cheeta\\ 00:07
21:48 PSL Jean-Rene, Alicia LVEA Y PSL Camera disconnect 01:46
21:50 ISC Richard LVEA Y Check on activities 23:42
21:55   Masayuki LVEA N Beam dump assembly 22:37
22:03 SQZ Sheila LVEA Y HAM7 OPO 00:00
22:53   Richard LVEA Y Checking on activities 23:41
22:57 FAC Tyler LVEA Y Crane upgrade wrap up 23:09
23:09 SUS Rahul LVEA Y HAM1 20:09
23:25 FAC Richard LVEA N Checks 00:07
23:28 PCAL Tony PCAL Lab N Setting up a measurement 22:28
23:37 SEI Jim LVEA Y HAM2 HEPI 00:06
00:07 ISC Keita LVEA Y Opening Light Pipe 02:07
00:24 JAC Jennie Vac-Prep Lab N Putting stuff away 01:24
00:35 SQZ Daniel, Eric LVEA N HAM7 Work 01:35
Comments related to this report
ryan.crouch@LIGO.ORG - 16:38, Thursday 18 December 2025 (88604)

00:38 UTC Keita reports the PSL light pipe is closed and he took the IMC to offline.

LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:42, Thursday 18 December 2025 (88586)
OPS Day Shift Start

TITLE: 12/18 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 13mph Gusts, 10mph 3min avg
    Primary useism: 0.06 μm/s
    Secondary useism: 0.36 μm/s 
QUICK SUMMARY:

IFO is in IDLE for PLANNED ENGINEERING

A look at today's activities (extends to Fri)

 

LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:38, Wednesday 17 December 2025 (88579)
OPS Day Shift Summary

TITLE: 12/18 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

IFO is in IDLE for PLANNED ENGINEERING

Lot's of good progress today:

Other:

Will edit to add alogs that are submitted after shift.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:57 SAF LASER LVEA YES LVEA is LASER HAZARD \u0d26\u0d4d\u0d26\u0d3f (\u2022O\u2022) 10:51
15:40 FAC Randy LVEA Y Craning in west bay 15:46
16:18 FAC Kim, Nellie LVEA Y Technical Cleaning 17:26
16:48 OPS Tony LVEA Y Turning on light pipe 16:53
16:56 TCS Louis, Matt Vac-Prep Lab N Cheeta Work 20:08
17:22 SQZ Sheila LVEA Y Scattered light investigation 20:04
17:26 SUS Rahul LVEA Y HAM1 JAC Work 20:04
17:30 SQZ Eric, Daniel, Robert LVEA Y HAM7 Scatter Light Investigation 20:04
17:33 VAC Jordan LVEA Y Purge air dew pt measurement 17:44
18:00 OPS RyanC LVEA Y Bring Dust monitor to HAM1 18:15
18:13 TCS Masayuki, Jennie Vac-Prep Lab N JAC Work - Jennie out 10:50 19:39
18:31 IAS Jason LVEA Y FARO Set-up by Biergarten out at 19:30 20:07
18:39 SUS Betsy LVEA/Labs Y Support for HAM1 20:04
19:13 TCS Jennie Prep lab N JAC work 19:39
19:42 SEI Jim LVEA Y Replace CPS card 20:51
20:04 PEM Robert LVEA Y HAM7 Scatter 21:50
20:07 FAC Randy MY N Moving boom lift to OSB 01:06
21:13 EE Fil CER N JM Coil Driver Check 22:00
21:24 IAS Ryan C, Jason LVEA Y BSC2 FARO 00:23
21:25 SUS Betsy, Rahul LVEA Y JAC Contd. 23:48
22:02 SQZ Sheila, Kar Meng, Daniel, Eric LVEA Y HAM7 Work Contd. 01:02
22:56 PCAL Tony PCAL Lab N Checking on meas. 23:02
23:09 OPS Oli LVEA Y HAM12 Rack Check 23:58
23:14 JOG Matt, Masayuki, Gabriele Yarm N Maintaining and improving health 23:52
00:01 TCS Matt Vac-Prep Lab N Cheeta Lab 01:01
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:39, Wednesday 17 December 2025 (88566)
OPS Day Shift Start

TITLE: 12/17 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 40mph Gusts, 26mph 3min avg
    Primary useism: 0.15 μm/s
    Secondary useism: 0.59 μm/s 
QUICK SUMMARY:

IFO is in IDLE for PLANNED ENGINEERING

A look at today's activities:

LHO General
ryan.short@LIGO.ORG - posted 16:53, Tuesday 16 December 2025 (88562)
Ops Day Shift Summary

TITLE: 12/17 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Busy afternoon! We changed plans a bit after we remembered that the HAM7 crew needed the IMC locked for their scattered light investigation, so work in HAM1 and the PSL to prep for JAC installation was put on pause. Locking the IMC went fairly smoothly; MC1, MC3, and the IMC PZT were moved back into alignment based on top-mass OSEMs from when the IMC was last locked, and once the light pipe was reopened, the IMC locked without issue. Input power was brought up to 10W at the HAM7 team's request. Scattered light work in HAM7 will continue tomorrow, but for tonight we've shut the PSL light pipe and lowered input power back down to 1W since chambers are open.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:57 SAF LASER LVEA YES LVEA is LASER HAZARD Ongoing
15:38 FAC Tyler X-Arm N Tumbleweed clearing 23:32
15:55 FAC Nellie, Kim LVEA N Technical Cleaning 17:11
16:31 FAC Randy LVEA N Craning in north bay 18:11
16:34 TCS TJ LVEA N Checking TCS Cabinets 18:12
16:44 VAC Jordan LVEA N Relay Tube Venting 20:31
17:11 JAC Rahul Optics Lab N Periscope Work for JAC 20:21
17:16 VAC Travis LVEA N Relay Tube Venting 19:39
17:19 VAC Gerardo LVEA N Relay Tube Venting 20:31
17:21 MAT Matt Optics Lab N Laptop retrieval 17:26
17:26 PCAL Tony PCAL Lab N Transfer Standard Measuremenmt 19:03
17:30 FARO Masayuki, Jason LVEA N HAM1 FARO Work 19:25
17:38 EE Fil EY N Cable cleanup, suspension rack 18:44
17:40 SUS Betsy LVEA N HAM1 19:29
17:44 FAC Nellie EY N Technical Cleaning 18:38
17:44 FAC Kim FCES N Technical Cleaning 18:30
17:51 JAC Jennie Optics Lab N JAC 19:14
18:04 TCS Matt Prep Lab N CHETA work 18:43
18:10 FAC Mitchell, Randy LVEA N BSC2 Work 19:27
18:11 SQZ Eric LVEA N HAM7 Grabbing Cavity 18:21
18:20 PEM Robert, Alicia, Jean-Rene LVEA N HAM1 Looking for 30Hz Peaks 19:36
18:20 FAC Richard LVEA N Checking on HAM7 Crew 18:44
18:22 SQZ Daniel, Kar Meng, Eric Optics Lab N Looking at old VOPO 19:12
18:27 PEM Sam LVEA N Accelerometer check HAM1 18:47
18:30 FAC Kim H2 Building N Technical Cleaning 18:41
19:03 TCS Tony MER N TCS chillers 19:16
19:30   Jennie Optics Lab N JAC 20:21
19:36 PEM Jason, Robert, Alicia, Joan-Rene LVEA N Noise hunting 19:40
19:36 FAC Kim LVEA N Technical Cleaning 20:19
20:30 PSL Ryan S LVEA Y Transition to LASER HAZARD 20:42
20:36 JAC Daniel CER - JAC cabling 21:30
20:40 PEM Jason, Robert, Alicia, Joan-Rene LVEA Y PSL Racks 21:07
20:59 FAC Randy LVEA - BSC2 Work 21:33
21:03 JAC Jason, Masayuki LVEA YES Capture alignment in HAM1 22:31
21:05 VAC Travis LVEA Y Checking on pumps 21:05
21:29 CAL Tony PCal Lab N Swapping spheres 21:36
21:32 JAC Betsy LVEA YES HAM1 JAC work 22:56
21:39 SQZ Sheila, Kar Meng, Eric, Daniel LVEA - HAM7 scattered light (Sheila out @ 00:08) Ongoing
21:41 JAC Rahul, Jennie Opt Lab N JAC periscopes 00:51
22:21 VAC Jordan LVEA - Check relay tube 23:07
23:01 PEM Robert PSL Local Tracing cables 00:40
23:10 JAC Betsy, Masayuki Opt Lab N JAC prep (Masayuki out @ 00:24) 00:39
23:18 AOS Richard LVEA - Talking to Sheila 23:23
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:41, Tuesday 16 December 2025 (88537)
OPS Day Shift Start

TITLE: 12/16 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 15mph Gusts, 10mph 3min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 1.00 μm/s 
QUICK SUMMARY:

IFO is in IDLE for PLANNED ENGINEERING

A look at today's planned activities:

 

LHO General
thomas.shaffer@LIGO.ORG - posted 16:30, Monday 15 December 2025 (88524)
Ops Day Shift End

TITLE: 12/16 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: Both HAM1 doors off, the ISI is locked, and table masses are being moved. the sush12 front end has been swapped and is back up but the single suspensions aren't quite right yet. HAM7 OPO work continued. Norco came this afternoon and filled CP5. Corner station is still under vacuum. Also, it's windy.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:57 SAF LASER LVEA N LVEA is Upgrade Phase LASER SAFE \u0d26\u0d4d\u0d26\u0d3f (\u2022_\u2022) 10:51
16:03 SYS Randy LVEA n Craning pallets, prepping areas for doors off 18:13
16:47 SYS Jason LVEA n Check in with Randy and help out there 18:19
16:48 SUS Rahul Opt Lab n Checking on parts 16:49
16:53 CDS Fil LVEA N Disconnecting ISCT1 17:49
16:55 PEM TJ LVEA N Turning on HAM1 DM and checking HAM6 DM 17:24
17:00 AOS Betsy LVEA N Bellows removal prep 18:50
17:04 VAC Jordan, Travis LVEA N HAM1 vent prep, CS vent 20:11
17:07 CAL Tony PCal Lab Local Setting up measurement 17:14
17:13 PEM Robert LVEA N Investigating cable 17:19
17:21 SAF RyanS LVEA n Transitioning to Upgrade SAFE 17:37
17:49 SUS Jeff CER n Helping Fil with SUS chassis 23:18
17:49 CDS Fil CER n SUS h12 chassis work 00:58
17:57 FAC Kim, Nellie LVEA n Tech clean 17:58
18:14 TCS Matt, Louis, Gabriele Prep lab n Cheta table prep 19:58
18:25 FAC Kim, Nellie LVEA n HAM1/2 cleaning 19:38
18:35 SQZ Jennie LVEA n SQZ table peek 19:20
18:39 SEI Jim LVEA n Locking HAM1 HEPI 19:03
18:50 SYS Randy LVEA n Checking in at HAM1 22:52
18:53 SQZ Sheila, Kar Meng, Eric O., Daniel D. LVEA N OPO installation in HAM7 20:11
19:02 VAC Gerardo LVEA N HAM1 venting 20:11
19:22 SEI Jim LVEA N Prepping for chamber work; looking at parts 19:28
19:37 AOS Betsy LVEA N Checking on things 19:41
20:42 SYS Betsy LVEA n Checking on cleanroom 21:23
21:10 VAC Gerardo, Travis, Jordan LVEA n HAM1 Doors (Travis out at 2258) 23:14
21:22 CDS Daniel CER,CR n Beckhoff work 00:05
21:25 CDS Erik FCES n Looking for Wifi 21:46
21:36 ISC Corey Opt Lab n Looking for peek zip ties 21:45
21:38 SQZ Sheila, Kar Meng, Eric O, Daniel D LVEA n HAM7 OPO work (Sheila out at 0006) 00:14
21:42 OPS Richard LVEA n Checking on teams 00:10
21:46 IO Jennie, Masayuki Opt Lab n JAC prep 01:06
22:08 VAC Norco MX n LN2 fill 00:23
22:10 SUS Rahul Opt Lab n Optics cleaning and setting down JMs 22:31
22:25 SYS Betsy LVEA n Check on HAM1 22:52
22:25 SQZ Jim LVEA n HAM7 help 02:11
22:50 FAC Tyler LVEA n HAM1 help 22:51
22:59 SYS Betsy LVEA n Checking on vent teams 00:51
23:03 SEI Mitchell LVEA n HAM1 locking with Jim 01:03
23:29 VAC Jordan, Travis LVEA N Relay tube vent prep 00:05
23:57 SUS Rahul Opt Lab n Dropping off parts 00:00
23:58 FAC Tyler Xarm n Tumbleweed clearing 00:58
00:06 PCAL Tony PCAL lab local Sphere swap 01:06
00:16 CDS Marc LVEA n Installing JAC heater cable 01:16
Images attached to this report
LHO General
thomas.shaffer@LIGO.ORG - posted 07:35, Monday 15 December 2025 - last comment - 12:19, Monday 15 December 2025(88508)
Ops Day Shift Start

TITLE: 12/15 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 25mph Gusts, 19mph 3min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.44 μm/s 
QUICK SUMMARY: Gate valves 5 & 7 closed, plan is to vent the CS and start the SUS CDS upgrade. Vent meeting at 830 in the control room today to coordinate.

Comments related to this report
thomas.shaffer@LIGO.ORG - 07:56, Monday 15 December 2025 (88509)

Noting the current state of the select systems:

  • SEI
    • HAM7 - ISI tripped due to vent work
    • HAM3 - Looks like the ISI tripped Dec 13 0723 UTC. Untripping now.
    • As vent work progresses today, we will transition HAM1&2 into safe states
  • SUS
    • All SUS damped
    • OPO is in an odd state where the guardian says it's in SAFE, but the master switch is on and signals are going out. I'm guessing that this is the result of Friday vent activities. I will confirm with that team.
  • CDS
    • No major errors or systems in odd states
  • VAC
    • Gate valves 5&7 closed
    • Currently the CS is still under vacuum.
betsy.weaver@LIGO.ORG - 12:19, Monday 15 December 2025 (88516)
Full into Vent Mode now, here is the current plan for the next few days.
Images attached to this comment
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:22, Friday 12 December 2025 (88502)
OPS Day Shift Summary

TITLE: 12/13 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

IFO is in IDLE for Planned Engineering

TLDR - Last few big remaining lock health checks were successfully done.

First, initial alignment was ran successfully and automatically. 

We then started our day with 5 lock steps we wanted to confirm as working in the case that we could not fully lock:

To get around SRC1 P/Y instability, that would take time we don't have to fix, we locked while manually touching SRM at different times, notably: DRMI_LOCKED_CHECK_ASC, PREP_ASC_FOR_FULL_IFO, MOVE_SPOTS. However, after not being able to get past MOVE_SPOTS - couldn't keep RFPOP90 low enough with SRM touches, we tried a different method to get over the remaining checks suggested by Jenne:

  1. Stop at 25W, touch SRM (counts on H1:LSC-POPAIR_B_RF90_I_NORM_MON good if under 12)
  2. Manual to Lownoise Coil Drivers - Successful.
  3. Auto until LOWNOISE_ESD_ETMX - Successful.
  4. Manual to OMC Whitening, damp violins - Successful. Tony Damped violins.
  5. Manual to Laser Noise Suppression - Mostly successful - Ryan S took care of this with advice from Keita about the scaling of the IMC_REFL and LSC_REFL IN1/2 and Fast Gain Servo Gains.

For a very comprehensive summary of locking progress, check out Ryan S's Wonderful Alog 88498.

Lock Acquisitions:

  1. Lockloss due to SRC1 P/Y at Prep_ASC_FOR_FULL_IFO. SRM railed prior.
  2. Lockloss due to Technical Cleaning at HAM2. HAM2 WD Tripped. Cleaning stopped after this.
  3. Lockloss due to failed SRM adaptation (with ops acting as SRC1) at MOVE_SPOTS
  4. Lockloss at Laser Noise Suppression upon activation of IMC_REFL Fast Gain at 25W
  5. Lockloss at Laser Noise Suppression upon activation of IMC_REFL Fast Gain at 25W - though this time we confirmed it was likely the fast gain since Keita and Ryan S stepped through the state with gains scaled to 25W.

Meanwhile,

LOG:                                                                                                                                                                                                      

Start Time System Name Location Lazer_Haz Task Time End
15:57 SAFETY LASER HAZ STATUS LVEA N LVEA is LASER SAFE \u0d26\u0d4d\u0d26\u0d3f (\u2022_\u2022) 10:51
15:38 FAC Nellie and Kim LVEA HAM7, HAM2, HAM1 N Technical Cleaning 17:01
16:05 VAC Jordan LVEA N Purge Air Meas. 16:19
18:21 EE Marc CER N Hi-Voltage HAM7 18:29
18:53 SQZ Kar Meng, Daniel, Keita LVEA N HAM7 OPO 19:53
21:03 TCS Matt Optics, Vac Prep N CHETA work 23:18
21:51 VAC Jordan LVEA N Closing gate valves, turning on HAM1 cleanroom 23:19
22:21 ISC Jennie LVEA N Looking for camera mount 22:47
22:21 JAC Daniel LVEA N JAC cabling 00:21
22:25 SQZ Keita, Kar Meng, Daniel D. LVEA N HAM7 OPO swap 00:18
22:48 JAC Marc LVEA N JAC cabling 00:48
23:11 FIT Masayuki Arms N On a run 23:41
23:53 JAC Jennie Opt Lab N Looking for parts 00:53
00:04 JAC Masayuki Opt Lab N Joining Jennie 01:04
LHO General
jordan.vanosky@LIGO.ORG - posted 15:19, Friday 12 December 2025 (88501)
HAM1 Cleanroom turned on in prep for vent

I powered on the HAM1 cleanroom at ~3:10 PST in prep for next week's HAM1 vent.

LHO General
corey.gray@LIGO.ORG - posted 18:02, Thursday 04 December 2025 - last comment - 09:08, Friday 19 December 2025(88350)
Thurs DAY Ops Summary

TITLE: 12/04 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

After CDS & H1-Locking work of yesterday, today we transitioned to starting prep work for the upcoming vent of HAM7.

However, there was more CDS work today which was related to ISC Slow Controls....but in the middle of this...

There was a 90min power outage on site!!
 

LOG:

Images attached to this report
Comments related to this report
oli.patane@LIGO.ORG - 18:36, Thursday 04 December 2025 (88370)

Recovery milestones:
22:02 Power back-up
22:04 CDS / GC seeing what's on/functional, then bring infrastructure back up
22:10 VAC team starts Kebelco to support the ar pressure that's keeping the cornerstation gate valves for closing
22:13 Phones are back
22:17 LHO GC Internet's back
22:25 GC wifi back up, alog and CDS back up
22:40 RyanS, Jason, Patick got PSL beckoff back up
22:55 VAC in LVEA/FCES back up
22:57 CDS back up (only controls)
23:27 PSL computer back
00:14 Safety interlock is back
00:14 HV and ALSY on at EY
00:35 opslogin0 back up
00:37 CS HV back up
00:53 CS HEPI pump station controller back up
01:05 CO2X and CO2Y back up
01:10 HV and ALSY on at EY
01:22 PSL is alive

Note: EY 24MHz oscillator had to be power cycled to resync

Casualties:
- lost ADC on seiH16
- 18V power supply failure at EY in SUS rack

Log:

Start Time System Name Location Lazer_Haz Task Time End
22:32 VAC Gerardo MX, EX, MY, EY n Bringing back VAC computers 23:41
23:32 VAC Jordan LVEA, FCES n Bringing back VAC computers 22:55
22:54 PSL RyanS, Jason LVEA n Turning PSL chiller back on 23:27
23:03 VAC Jordan LVEA n Checking out VAC computer 23:41
23:56 SAF Richard EY n Looking at safety system 00:25
00:02 JAC Jennie JOAT, OpticsLab n Putting components on table 01:24
00:19 SAF TJ EX n Turning on HV and ALSX 00:49
00:38 TCS RyanC LVEA n Turning CO2 lasers back on 01:06
01:03 EE Marc CER n Power cycling io chassis 01:14
01:06 PSL RyanS, Jason LVEA n Checking makeup air for PSL 01:10
01:07 JAC Jennie LVEA n Grabbing parts 01:14
01:08 beckhoff patrick cr - BRSx recovery 02:20
01:08 sei jim EX.EY - HEPI pump station recovery 01:58
01:25 SEI Patrick EX n BRSX troubleshooting 01:54
01:27 EE Marc EX n Looking at RF sources 02:09
02:00 EE Fil EY n Power cycling SUSEY 02:19
02:09 VAC Gerardo MX N Troubleshooting VAC computer 02:27
02:12 EE Marc CER N Checking power supplies 02:16
ryan.short@LIGO.ORG - 19:20, Thursday 04 December 2025 (88372)OpsInfo

Since Oli's alog, I tried to keep a rough outline of the goings-on:

Marc and Fil went down to EY to replace the failed power supply, which brought life back to the EY frondends.

Dave noticed several models across site had timing errors, so he restarted them.

Gerardo continued to torubleshoot VAC computers at the mid-stations.

Once CDS boots were finished, I brought all suspension Guardians to either ALIGNED or MISALIGNED so that they're damped overnight.

I started to recover some of the Guardian nodes that didn't come up initially. When TJ started the Guardian service earlier, it took a very long time, but most of the nodes came up and he put them into good states for the night. The ones that didn't come up (still white on the GRD overview screen) I've been able to revive with a 'guardctrl restart' command, but I can only do a couple at a time or else the process times out. Even this way, the nodes take several minutes to come online. I got through many of the dead nodes, but I did not finish as I am very tired.

Main things still to do for recovery:  (off the top of my head)

  • Finish reviving dead Guardian nodes
  • Maybe restart the main file server (Dave suspects this is the cause of general slowness of CDS machines)
  • Ensure seismic is in a good place
  • Finish Beckhoff software updates that were in-progress at the time of the outage
  • Clear up remaining IPC errors across CDS land
  • Turn lasers back on
  • Check suspension positions
  • Lots of other things probably
  • Thank everyone for their tireless efforts
corey.gray@LIGO.ORG - 09:08, Friday 19 December 2025 (88615)EPO

EPO-tagging for power outage

Displaying reports 1-20 of 8011.Go to page 1 2 3 4 5 6 7 8 9 10 End