LVEA: Laser Hazard Observation Bit: Undisturbed 07:45 Cleared TIM, ADC, & IPC errors at both end stations 08:00 IFO Locked at 24.3W and 65Mpc 08:20 Hanford Fire department on site 08:35 IFO LockLoss – Commissioning activities 09:00 Jason & Peter – In the PSL 09:30 Sudarshan – Going into LVEA to remove ISS Outer Loop Servo 09:36 Bubba – Moving items in and out of LVEA Hi-Bay 10:12 Kyle & Gerardo – Going to End-Y beam tube to work on new Ion pump 10:44 Sudarshan & Kiwamu – Going to LVEA to install repaired ISS Outer Loop Servo 11:00 Sudarshan & Kiwamu – Out of the LVEA 11:05 Sudarshan & Travis – Going to End-X for PCAL clipping investigation 11:03 Vinnie – Going to Mid-X 11:05 Kyle & Gerardo – Going into End-Y to recover an Ion pump 11:30 Rick – Going to End-X for PCAL work 11:45 Kyle & Gerardo – Back from End-Y 11:50 Jeff – Deliver tools to PSL Enclosure 12:15 Jason & peter – Out of the PSL enclosure 12:18 Rick, Sudarshan, & Travis – Out of End-X 12:24 Kiwamu – Going into LVEA to take TF on ISS Outer Loop Servo 12:36 Jim, TJ, & Cheryl – Going into the LVEA to reset the NPRO RRO 14:13 Kiwamu & Sudarshan – Out of LVEA