H1 PSL
michael.rodruck@LIGO.ORG - posted 16:42, Tuesday 10 January 2012 (2006)
H1 PSL installation

Table legs were grouted into place today, with help from Robert and Anamaria. Fans are running on top of the legs and drying out the hydrostone.

Additionally, table cleaning is making good progress. Christina and Terisha are in the final stages, blowing dust out of the tapped holes and vacuuming it up.

Images attached to this report