james.batch@LIGO.ORG - posted 15:36, Thursday 30 July 2015 (20068)
Added IRIG-B signals to AA chassis at EX, EY
Jim Batch, Stefan Countryman

Cables connecting IRIG-B outputs and channel 31 (of 32) of the BNC AA chassis have been installed at EX and EY.  The signal at EX will be read by a model and sent to a frame in the near future.  A model change and DAQ restart will be required to finish this task.