Reports until 16:03, Thursday 30 July 2015
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:03, Thursday 30 July 2015 (20070)
Ops Day Shift Summary
LVEA: Laser Hazard
IFO: Unlocked
Observation Bit: Commissioning

07:45 Cleared IPC errors on H1SUSTMSY & H1SUSTMSX
08:00 IFO Down – Travis working on locking
08:25 Kiwamu & Sudarshan – Going into LVEA to take TFs on ISS Outer Loop Servo
08:58 Joe – Going to both Mid-Stations to work on rodent control
09:00 Andres & Stefan C. – Going to End-X to take some measurements 
09:32 Ed – Going to Mid-X to recover an AA-Chassis
09:35 Andres & Stefan – Back from End-X
09:48 Joe – Back from Mid-Stations
09:58 Karen – Cleaning at Mid-Y
10:03 Filiberto – Going to the CER to work on Cosmic Ray 
10:05 Kiwamu & Sudarshan – Out of the LVEA 
10:15 Christina – Cleaning at Mid-X 
10:55 Karen – Back from Mid-Y
11:00 Christina – Leaving Mid-X
11:27 Kiwamu & Sudarshan – In LVEA to take TFs on ISS Outer Loop Servo
12:30 Vinnie –In the LVEA to check PEM cabling
12:41 Kiwamu & Sudarshan – Out of the LVEA
13:14 Filiberto – Reinstall Cosmic Ray chassis 
13:39 Vinnie – In the LVEA to center tilt meter
14:16 Jim B. & Stefan C. – Going to End-X to pull cables in the CER area
14:27 Sudarshan – Going into LVEA to recover electronics
14:35 Kiwamu & Jenne – Taking student tours through LVEA
14:42 Jim B & Stefan C. – Finished at End-X – Going to End-Y
14:47 Kyle – Putting crate back in mechanical building – Will be using forklift
15:20 Kyle – Finished moving crate
15:35 Jeff – Going to End-X to get laser glasses for DtChar tour
15:55 Jeff – Back from End-X