LVEA: Laser Hazard IFO: Unlocked Observation Bit: Commissioning 07:45 Cleared IPC errors on H1SUSTMSY & H1SUSTMSX 08:00 IFO Down – Travis working on locking 08:25 Kiwamu & Sudarshan – Going into LVEA to take TFs on ISS Outer Loop Servo 08:58 Joe – Going to both Mid-Stations to work on rodent control 09:00 Andres & Stefan C. – Going to End-X to take some measurements 09:32 Ed – Going to Mid-X to recover an AA-Chassis 09:35 Andres & Stefan – Back from End-X 09:48 Joe – Back from Mid-Stations 09:58 Karen – Cleaning at Mid-Y 10:03 Filiberto – Going to the CER to work on Cosmic Ray 10:05 Kiwamu & Sudarshan – Out of the LVEA 10:15 Christina – Cleaning at Mid-X 10:55 Karen – Back from Mid-Y 11:00 Christina – Leaving Mid-X 11:27 Kiwamu & Sudarshan – In LVEA to take TFs on ISS Outer Loop Servo 12:30 Vinnie –In the LVEA to check PEM cabling 12:41 Kiwamu & Sudarshan – Out of the LVEA 13:14 Filiberto – Reinstall Cosmic Ray chassis 13:39 Vinnie – In the LVEA to center tilt meter 14:16 Jim B. & Stefan C. – Going to End-X to pull cables in the CER area 14:27 Sudarshan – Going into LVEA to recover electronics 14:35 Kiwamu & Jenne – Taking student tours through LVEA 14:42 Jim B & Stefan C. – Finished at End-X – Going to End-Y 14:47 Kyle – Putting crate back in mechanical building – Will be using forklift 15:20 Kyle – Finished moving crate 15:35 Jeff – Going to End-X to get laser glasses for DtChar tour 15:55 Jeff – Back from End-X