LVEA: Laser Hazard IFO: Locked Observation Bit: Commissioning 07:45 Cleared IPC errors on H1SUSTMSY & H1IOPASCO 08:00 IFO locked at Low Noise, 24.2w, 68Mpc 08:35 Karen – Cleaning in the LSB cleaning area 09:16 LockLoss – Unknown 09:17 Kiwamu & Sudarshan – Going into LVEA to make ISS Outer Loop Servo measurements 09:19 Robert – Going into LVEA to setup for PEM injection 09:22 Jason – Going into LVEA to check PR3 OpLev 09:25 Kyle & Gerardo – Going to End-Y to get pump cart 09:30 ISI-ITMY WD trip – Robert doing PEM setup work in Beer Garden 09:53 Kyle & Gerardo – Finished at End-Y – back to CS 10:00 Kyle & Gerardo – Going to End-X to connect pump cart 10:17 Kyle – In LVEA to take valve off Pump Cart 10:20 Kyle – Out of LVEA 10:27 TJ – Going to End-X to reset BRS 11:07 Dave – Restarting models after OAF crash 11:12 Stefan – Going into MSR to work on atomic clock 11:27 Stefan – Out of MSR 11:30 Sudarshan – In LVEA plugging monitoring equipment 11:50 IFO Locked at Low Noise, 24.1w, 65Mpc 11:55 Dave – DAQ restart – NOTE: DAQ restart did not take IFO out of lock 12:12 IFO LockLoss – DAQ restart/Guardian/etc 12:36 Kyle & Gerardo – Back from End-X 12:39 Vendor on site to restock machines 12:47 Bubba – Test fire pumps 14:28 Dave & Stefan – At End-Y to install attenuator 14:50 Dave & Stefan – Going to Mid-Y to power cycle PEM 15:05 Dave & Stefan – Back from Mid-Y 15:15 Dave & Stefan – Going to End-X to install attenuator 15:30 Dave & Stefan – Back from End-X