Tuesday Jan 10 between 17:45 and 18:30 PST, bscsteststand2 and seiteststand2 in the staging building were rebooted and the models that had been running were restarted to correct timing. This was done as a result of moving equipment that supply timing in the MSR, which interrupted the 1PPS timing to the staging building. The timing signal is now supplied directly from the master fan out in the MSR.