Ops Day Shift Summary
LVEA: Laser Hazard
IFO: Unlocked
Observation Bit: Commissioning  

Times in UTC
15:00 IFO unlocked for Ops locking training
18:20 Hugh – Going to end stations to check HEPI fluid reservoir levels
18:28 Ed – Going to Mid-X to reinstall repaired AA chassis 
18:52 Ed – Back from mid station
20:45 Filiberto – Cabling work at Mid-Y
21:31 Daniel – Going into CER
22:08 Stefan – Going to ISC rack
22:10 Kyle – Going into End-X VEA to connect and start RGA bakeout 
22:25 Stefan – Out of the LVEA