BSC8 SEI/SUS Current State
Once the Arm Cavity Baffle crew and gear started to pile up at the dam and door, we decide it was time to secure things.
EricA locked down the ISI above.  Then Betsy & crew locked down both the ITM and FM suspensions.  They also put some shielding and covers over the ITM for protection.  Finally, I locked down the HEPI.