Reports until 15:35, Friday 07 August 2015
LHO FMCS
bubba.gateley@LIGO.ORG - posted 15:35, Friday 07 August 2015 (20335)
Beam Tube Enclosure Joint Repair on the X-Arm
Chris S. Joe D.80%

8/4/15 - 8/7/15
The crew installed metal strips on 120 meters of tube enclosure. That was the last of the strips that were cut to length. We had one more roll which was cut into 10' lengths today.