This morning, with an hour long 60mpc lock behind us, Evan and I cleared SDF from the weekend commissioning efforts. We:
- accepted most of the re-phasing of the ASC/LSC PDs that was done (we reverted a few of his changes which he did not like).
- set the SDF to ignore the LOCKIN channels that had been used over the weekend.
- zeroed out a few ASC loop offsets (MICH, DHARD, etc.) that were put in over the weekend during testing, but were then turned off.
- accepted Dan's change of the 4 OMC dither path gains from 0.1 to 1.0 on Wed Aug 6th (H1:OMC-ASC_P1_CLOCK_GAIN, ...)
Also, I:
- reverted some unused ITM L3 ESD settings from last week that seemed odd (Kissel confirmed).
- accepted the GAIN change of 1 from 25,000 in the LSC-CARM bank which is unused.
This corrected the ASC SDF 44 red errors today - all green!