Reports until 16:26, Friday 13 January 2012
H2 SUS
jason.oberling@LIGO.ORG - posted 16:26, Friday 13 January 2012 (2038)
ERM Pitch Measurements

J. Oberling, T. Sadecki

Set up the LSAT for the ERM at End Y this afternoon: leveled the LSAT structure and the Reaction Chain (RC) lower structure using an optical level.  We then looked at both the double-hang and triple hang pitch of the ERM: