Reports until 12:11, Friday 14 August 2015
LHO FMCS
bubba.gateley@LIGO.ORG - posted 12:11, Friday 14 August 2015 (20533)
Beam Tube Enclosure Joint Repair on the X-Arm
Chris S.(85%) Joe D.(60%)

Since 8/4 the guys have had various other chores, they also had to cut more metal into 10' lengths and since that date they have cleaned the existing seal joints, installed metal strips and caulked 500 meters of upper tube enclosure.

This brings the total installed to 1680 meters of enclosure on X-1. We are currently waiting on more metal to arrive. It has been ordered for 3 weeks.