J. Kissel, J. Oberling, B. Weaver Up to bat for the Recovery Team tomorrow: Operator: T. Sadecki DetEng: B. Weaver, J. Oberling Commissioning: J. Driggers Attached is tomorrow's Maintenance Plan. The major activities (i.e. those with the greatest impact) will be - an adjustment of the PSL's PMC Temperature to try to restore the full power output, and - moving the violin mode monitors out of the QUAD models and into the OAF model to try to reduce the computation turn-around time for the ETMs and mitigate timing overages with the slower front ends. Full List (In Chronological Order): 1st Wave (as soon as Peter arrives in the morning) - Adjust temperature / alignment of PMC remotely from control room 2nd Wave (~8:00 am) - Monitor PMC temperature / alignment of PMC, if remote change doesn't have desired affect, then PSL incursion. - Commissioning HEPI HAM1 inertial isolation - Remove violin mode damping from QUADs, Install into OAF - Updates to ODC MASTER model to include/update TCS - New power supply on corner-station TCS Hartmann WFS - New power supply on corner-station PEM electronics 3rd Wave (~9:00a) - Add all newly requested channels to GDS broadcaster, low-latency frames - Total GDS package upgrade - Charge measurements on ETMs - Watch for Beckhoff crash at EX The hope is to begin recovery by 10a, such that we have a full IFO back up and running by 12p PT! This looks to be a pretty light maintenance day (finally!), but we'll see how it goes.