Bland, Sadecki Yesterday, we worked towards attaching the lower reaction chain to the full QUAD. We: - Moved it to the 5-axis scissor lift - Rerouted and secured the cables on this portion of the chain - Maneuvered it under the ISI next to the main chain - Pulled the FirstContact on the ERM HR surface (blew with filtered N2 and drag wiped residual ring around the edge near the ID of the gold coating) - Pulled the FirstContact from the ETMy AR - found that there was sever streaking on the mass under the FC at the top 3 inches of the sheeting, as well as a smear of FC on centerline, right 3". <- Awww, game over. - Repainted on new FC sheet with PEEK tab. - Left it overnight to dry since it was so late in the day. So, unfortunately we could not get the chain attached due to the FC process.