Scott L. Ed P. 8/17/15 48.2 meters of tube and bellows cleaned ending 8.4 meters east of HSW-2-002. 8/18/15 20.8 meters of tube cleaned ending at the west wall of Mid-Y. The crew will stop at this point until after the O1 Run. All equipment and cords will be thoroughly cleaned and put away for storage.