We ran dither lines for BS and SRM during the power increase, as well as during the 45MHz EOM modulation depth reduction: Lines: H1:SUS-SRM_M3_ISCINF_P_EXC 7.0Hz, 300cts H1:SUS-SRM_M3_ISCINF_Y_EXC 7.5Hz, 900cts H1:SUS-BS_M3_ISCINF_P_EXC 8.0Hz, 100cts H1:SUS-BS_M3_ISCINF_Y_EXC 8.5Hz, 30cts Lines started by 2015/08/22 06:23 UTC Start PWR UP: 2015/08/22 06:24 UTC Stop PWR UP: 2015/08/22 06:26 UTC Start EOM MOD: 2015/08/22 07:02 UTC Stop EOM MOD (-4dB): 2015/08/22 07:11 UTC Lock loss: 2015/08/22 07:15 UTC The EOM reduction reached -3dB, and was lost due to a SRC1_Y run-away. Attached are (all plots have 72 min span, halting just before lockloss): - Plot 1: AS RF36 PIT and YAW signals, plus the ASAIR_A_LF_OUTPUT for reference, showing i) power increase, ii) beam diverter closing, and reopening, iii) modulation index reduction. = Plot 2: All quadrants of the AS36 WFS, on the same scale More details later.