Reports until 16:51, Saturday 22 August 2015
H1 CAL
kiwamu.izumi@LIGO.ORG - posted 16:51, Saturday 22 August 2015 - last comment - 10:03, Wednesday 26 August 2015(20788)
Calibration prep: ETMY dtt templates tuned

Since LLO had been down in this afternoon, I took this oportunity to renew the dtt templates that are for measuring the transfer function of each stage of ETMY. I tuned the envelop parameters while the interferometer was locked at 23 W in the NOMINAL_LOW_NOISE state. The attached are the resultant templates. The frequency range is newly adjusted to [10 200] Hz with 21 frequency data points as planned. Each one takes several minutes to complete the measurement. According to the results I got, we can get a quite good coherence for all the relevant stages (i.e. L1, L2 and L3 stages) at all the frequency points with a coherence of more than 0.99. On the other hand, the template for measuring the DARM closed loop in this particular frequency band may need a bit more tuning because the coherence was not as great as the ones for the ETMY transfer functions.

Non-image files attached to this report
Comments related to this report
jeffrey.kissel@LIGO.ORG - 10:03, Wednesday 26 August 2015 (20918)
These measurements have been committed to the CalSVN repo, under 
/ligo/svncommon/CalSVN/aligocalibration/trunk/Runs/ER8/H1/Measurements/FullIFOActuatorTFs/2015-08-22/
2015-08-22_H1SUSETMY_L1toDARM_FullLock.xml
2015-08-22_H1SUSETMY_L2toDARM_FullLock.xml
2015-08-22_H1SUSETMY_L3toDARM_LVLN_LPON_FullLock.xml