michael.rodruck@LIGO.ORG - posted 16:37, Thursday 26 January 2012 (2095)
H1 PSL installation
Standoffs for the floating layer of sheetrock were installed. Several of the lower floating panels of sheetrock were attached as well. Electrical work inside the walls is getting close to being finished.